Resource Library

5 Fundamentals Guide
Guide

Profile’s 5 Fundamentals are the foundation to sustainable vegetation.

View Guide
Minnesota Parkway Slope Case Study
Case Studies

ProGanics® BSM™, Flexterra® HP-FGM™ and GreenArmor™ System Case Study: Minneapolis, Minnesota Parkway Slope

View Case Studies
New Hampshire DOT Case Study
Case Studies

ProGanics® BSM™ Case Study: Department of Transportation Site

View Case Studies
West River Parkway Slope Repairs (Land and Water: Jan/Feb 2017)
Proof Points

Multi-agency teamwork, correct material choices keys to success in Minnesota high-risk erosion control project.

View Proof Points
Soil Testing is the Key to Project Success
Instructions

Take advantage of a FREE soil test from ProfilePS3.com.

View Instructions
Profile’s 5 Fundamentals
Instructions

Profile’s 5 Fundamentals take the guesswork out of the crucial decisions that need to be made and will ultimately benefit both you—and—your customers.

View Instructions
Profile Project Map
Case Studies

View Profile's Project Case Studies in a Global Map.

View Case Studies
Futerra F4 SDS
SDS

To download the Futerra F4 SDS, click the link.

View SDS
Futerra 7003 TRM Spec Soil-Filled
Standard Specifications

This section specifies a permanent Geosynthetic Turf Reinforcement Mat (TRM) with soil infill, to prevent long-term soil and vegetation loss resulting from excessive water flow in which unreinforced vegetation could not resist.

View Standard Specifications
GreenArmor System Brochure - Chinese
Brochure

GreenArmor System Brochure - Chinese

View Brochure

Pages