Resource Library

Change Search Filters
New Hampshire DOT Case Study
Case Studies

ProGanics® BSM™ Case Study: Department of Transportation Site

View Case Studies
Futerra F4 SDS
Instructions

To download the Futerra F4 SDS, click the link.

View Instructions
Futerra 7003 TRM Spec Soil-Filled
Standard Specifications

This section specifies a permanent Geosynthetic Turf Reinforcement Mat (TRM) with soil infill, to prevent long-term soil and vegetation loss resulting from excessive water flow in which unreinforced vegetation could not resist.

View Standard Specifications