Resource Library

Change Search Filters
Memorial Park Land Bridge and Prairie
Case Studies

Efforts to revitalize Houston’s Memorial Park called for expert erosion control solutions to remedy years of urbanization in the Texas coastal prairie.

Watch Video
We’re Not Bluffing (Informed Infrastructure: October 2019)
Articles

See how the GreenArmor® System flipped this failed blanket project into a successful revegetation site.

View Articles
Soil Testing is the Key to Project Success
Instructions

Take advantage of a FREE soil test from ProfilePS3.com.

View Instructions
Profile’s 5 Fundamentals
Resource

Profile’s 5 Fundamentals take the guesswork out of the crucial decisions that need to be made and will ultimately benefit both you—and—your customers.

View Resource
Profile Project Map
Case Studies

View Profile's Project Case Studies in a Global Map.

View Case Studies
Futerra F4 SDS
Instructions

To download the Futerra F4 SDS, click the link.

View Instructions
Futerra 7003 TRM Spec Soil-Filled
Standard Specifications

This section specifies a permanent Geosynthetic Turf Reinforcement Mat (TRM) with soil infill, to prevent long-term soil and vegetation loss resulting from excessive water flow in which unreinforced vegetation could not resist.

View Standard Specifications
GreenArmor System Brochure - Chinese
Brochure

GreenArmor System Brochure - Chinese

View Brochure