Resource Library

Change Search Filters
Coal-Fired Power Plant ProGanics Case Study
Case Studies

Coal-Fired Power Plant Case Study: ProGanics Replaces Topsoil at Large Power Plant

View Case Studies
Futerra 7003 TRM Spec Soil-Filled
Standard Specifications

This section specifies a permanent Geosynthetic Turf Reinforcement Mat (TRM) with soil infill, to prevent long-term soil and vegetation loss resulting from excessive water flow in which unreinforced vegetation could not resist.

View Standard Specifications