Resource Library

Change Search Filters
Forest Lawn Memorial Park Case Study
Case Studies

ProGanics® BSM™ Case Study: Forest Lawn Memorial Park Project

View Case Studies
I-210/I-15 California Fire Reclamation Case Study
Case Studies

ProGanics® BSM™ and ProMatrix™ EFM™ Case Study: Fire Reclamation Project

View Case Studies
Luxor Creek Bridge Case Study
Case Studies

ProGanics® BSM™ Case Study: Renovated Bridge Project

View Case Studies
Baylands Golf Links Municipal Course Redesign & Rebuild Case Study
Case Studies

Baylands Golf Links in Palo Alto successfully redesigned and rebuilt the course using Profile products.

View Case Studies
Just Add Water (and Seed and Nutrients) (Erosion Control: January 2019)
Articles

Construction can lead to depleted soils. This article outlines why it’s best to improve soil quality with amendments, instead of trucking in topsoil.

View Articles
"Choosing the Right Machine” (Erosion Control: Nov/Dec 2018)
Articles

Erosion Control Magazine article highlighting the success of several projects with the proper hydroseeding equipment and Profile’s products.

View Articles
ProGanics Accelerates Vegetation Establishment on Caltrans Fire Reclamation Site
Resource

Article featuring Profile’s role in establishing vegetation after wildfires scorched the earth in Southern California.

View Resource
Southeastern U.S. Mine Reclamation Case Study
Case Studies

ProGanics™ BSM™ and Flexterra® HP-FGM™ Case Study: Mine Reclamation Project

View Case Studies